Civic Chief Bhushan Gagrani chaired the meeting, which included representatives from the Goldsmith Association and local residents. “Residents here suffer from respiratory diseases. The authorities should take this seriously,” he added
28 March,2025 07:25 AM IST | Mumbai | Sameer SurveNew dashboard to track real-time roadwork progress; citizens may get access in future
28 March,2025 07:20 AM IST | Mumbai | Sameer SurveIn Mankhurd, the officials discovered that a 250-metre stormwater drain has been disrupted owing to the Mumbai Metro construction work. The additional civic commissioner directed BMC officials to coordinate with the Mumbai Metro authority to ensure the completion of the work
27 March,2025 11:20 PM IST | Mumbai | A CorrespondentUnder the ‘Clean-Up Marshal’ initiative, marshals were appointed across all 24 administrative wards in Mumbai. Each ward had 30 marshals deployed through 12 different agencies
27 March,2025 10:08 PM IST | Mumbai | mid-day online correspondentThe BMC spent around Rs 500 crore on the redevelopment of 480 beds at Bhagwati Hospital. Of these, 148 beds will be reserved for the patients recommended by the civic body
27 March,2025 09:24 PM IST | Mumbai | Sameer SurveThe Brihanmumbai Municipal Corporation (BMC) has integrated its 'Debris On Call' service with the AutoDCR system, enabling developers to book debris removal online. The service will soon be available on the 'MyBMC' app, making waste management more efficient and eco-friendly
27 March,2025 09:39 AM IST | Mumbai | A CorrespondentComplaints of corruption, misconduct force BMC to scrap scheme by April 2025
27 March,2025 07:20 AM IST | Mumbai | Sameer SurveOfficials say after final report on hotel’s potential violations is sent to civic chief, action could be taken.Meanwhile, the basement where the studio was set up was found to be illegal based on Monday’s inspection. The stage, which measures 21.70 metres in length, 7.5 metres in width and 2.8 metres in height, was also checked
27 March,2025 07:08 AM IST | Mumbai | A CorrespondentAs activists wonder how structure was missed at the planning stage of road widening and storm-water drain project, BMC says will investigate. Officials cited delays caused by underground utility lines from the water engineering, sewerage, and other utility agencies
27 March,2025 06:53 AM IST | Mumbai | Sameer SurveRepairs begin after mid-day exposes flaws in newly concreted stretches
26 March,2025 10:53 AM IST | Mumbai | Ranjeet JadhavADVERTISEMENT