Around 23 minutes after lift-off, the primary satellite got separated and it was followed by six other co-passenger satellites, which were deployed into the intended orbits sequentially, ISRO said
This ISRO mission, which comes after the much-awaited Chandrayaan-3 launch earlier this month, is being undertaken by its commercial arm NewSpace India Limited (NSIL)
ISRO Chairman S Somanath said, "The PSLV-C56 carrying seven satellites including primary satellite DS-SAR and six co-passenger satellites have been successfully placed in the right orbits"
After the 25 hour countdown that commenced on Saturday concluded, the 44.4 metre tall rocket lifted off majestically from the first launch pad at this spaceport, one minute after the prefixed time of 6.30 am, emanating thick fumes on its tail
The lift-off time which was scheduled for 6.30 am today was later revised to 6.31 am as space debris was expected on the path of the rocket during its journey to the orbit. "Change of lift-off time occurs when space debris come in the path of rocket. That is what happened today," an ISRO official told PTI
ADVERTISEMENT