The Matunga Z Bridge connects the Central Railway's Matunga station to the Western Railway's Matunga Road station. Pics/Ashish Raje
The bridge was shut down in 2024 for reconstruction, causing significant inconvenience to local residents and commuters in the area
The closure of the bridge led to longer travel times and added pressure on alternative routes
With its reopening, people can now benefit from reduced travel times and more convenient access to both railway stations
The closure of the bridge during its reconstruction had been affecting daily commuters who relied on this bridge for a quicker connection between the two railway stations
The reconstruction work has now been completed, ensuring the bridge’s safety and improved structure for future use
ADVERTISEMENT