2023-07-17 03:23 PM IST | Mumbai
Prime Minister Narendra Modi will inaugurate the New Integrated Terminal Building of Veer Savarkar International Airport, Port Blair on 18th July via video conferencing. With a total built-up area of around 40,800 sqm., the new terminal building will be capable of handling about 50 lakh passengers annually. An Apron suitable for two Boeing-767-400 and two Airbus-321 types of aircraft has also been constructed at Port Blair Airport at a cost of Rs 80 crore, making the airport now suitable for parking of ten aircraft at a time. Inspired from nature, the architectural design of the airport terminal resembles a shell shaped structure depicting sea and islands. The new airport terminal building has a number of sustainability features like Double Insulated Roofing System to reduce heat gain, skylights to provide maximum inlet of abundant natural sunlight during day time to reduce artificial light usage inside the building, LED lighting, low heat gain glazing. Rainwater catchment in an underground water tank, on-site sewage treatment plant with 100% of treated wastewater reused for landscaping and a 500 KW capacity solar power plant are some other features of the terminal building ensuring minimal negative impact on the islands’ environment.