07 July,2018 07:02 AM IST | Mumbai | Rajendra B. Aklekar
The BMC had earlier denied that it had anything to do with the utility cables buried in the bridge
Upon discovering that at least 60 utility cables had been laid along the collapsed portion of the Andheri road overbridge (ROB), Western Railway authorities have written to the civic body on the matter. "The collective weight of so many utility cables may have contributed to the collapse of the bridge. We have written to the BMC to look into limiting the number of utility cables laid over such bridges," said Mukul Jain, divisional railway manager.
Many utility companies opt to lay wires along bridges, as this is easier and cheaper than putting them under the railway lines, which would require microtunelling. The utility companies pay a fee to the BMC for this arrangement, which is also less than the charge levied by the railways. "It is not that the railways do not allow utility cables to pass under the network, but besides levying fees, there are stringent norms and national rail standards for how this should be done," said DRM Jain.
Officials audit the Andheri ROB, which is set to reopen by today
Prima facie, it seems that the weight of over 60 utility cables may have added up the dead weight and led to the collapse of the pedestrian pathway along the corroded Andheri ROB. The bridge, built in 1978, was later expanded to include a pathway a year later. According to Jain, around a year ago, WR had conducted a survey to identify such cables that pass from once building terrace to another, crossing over railway tracks. The authorities found 45 such cables between Churchgate and Virar, and immediately disconnected them.
ALSO READ
Maharashtra Assembly Elections 2024: BJP declines support to NCP's Nawab Malik
Nitesh vs. Nilesh: Who is the wealthier Rane brother?
Ajit Pawar vs Yugendra Pawar: Poll affidavits reveal who’s the richer Pawar
Mumbai local train updates: WR train services hit due to technical snag
10,905 nomination papers of 7,995 candidates received as last day of filing ends
The other side
Despite repeated attempts to reach out to BMC officials for comment, they remained tight-lipped on the matter. However, earlier, chief engineer for bridges SO Kori had told mid-day, "Whenever utility agencies ask the BMC for permission to carry out any work at railway premises, we always direct them to the railways."
60
Approx number of utility cables on the pedestrian pathway of the Andheri ROB
45
Number of cable connections passing over tracks that WR cut
Also read: Andheri bridge collapse: BMC, Railways decide to 'sincerely' co-ordinate